Offshore wind reference list
The Port of Thyboron has been used by the offshore wind industry in numerous ways since 2016. Below is a list of offshore wind farms for which the Port of Thyboron has been used for both installation tasks and O&M. The port is also used for mobilising offshore vessels and sometimes for layovers.
Energy island – installation in 2030
- Geophysical surveys
Thor – installation in 2026
- Geophysical surveys
- Marine archaeology
- UXO activities
- Seabed mapping
Vesterhav Nord – installation in 2023
- Geophysical surveys
- Seabed preparation
- Geological survey
- Trafos - Heavy lift operation
- Marshalling Port for Foundation installation N/S
- Scour protection N/S
- Survey, boulder clearance, PLGR for cable installation N/S
- O&M
Nissum Bredning Offshore Test Wind Farm – 7 MW offshore wind turbines, installed in 2017
- Geophysical surveys
- Seabed preparation
- Geological survey
- Dredging
- Seabed preparation
- Onshore storage of piles and jackets
- Short-term floating storage of concrete TP´s and following main components tower, blade and nacelles.
- Jacket installation
- Transition piece installation
- Wind turbine construction
- Cable installation
- O&M
Horns Rev 3 – Constructed in 2018
- DP vessel
- Seabed preparation work
Thor – Construction in 2026
Vesterhav Nord – Construction in 2023